Loading Events

« All Events

  • This event has passed.

I-10 Ground Storage Reservoir Booster Station and 8inch Water Main

April 5 @ 10:00 am

RMCI, INC. will be bidding the following project as a General Contractor and asks that your firm provide us a material and/or labor quote:

I-10 GROUND STORAGE RESERVOIR, BOOSTER STATION AND 8-INCH WATER MAIN

DESCRIPTION: The project consists of furnishing and installing a new 16 and 8-inch water pipe, that will tie-in to the existing 8-inch asbestos cement water pipe and flow into the new 0.5 million gallons ground water storage reservoir, complete in place with all appurtenances, cathodic protection, altitude valve, fire hydrant, etc. Furnish and install a new 8-inch pipe from the reservoir into a new Concrete Masonry unit (CMU) booster station building. The booster station will house two new centrifugal pumps, two new VFD pump panels, and new RTU Panel, along with all the required equipment and appurtenances necessary for a fully operational site. Furnish and Install new chlorine dosing prefabricated fiberglass building and all applicable equipment and appurtenances, and a 100-kW backup generator. Furnish and install a new 8-inch water magnetic meter in H-20 rated vault and hatch, and reconnecting to the existing 8” water line. There will be site improvements to include, but not be limited to, site grading, construction of a retention pond, sidewalk, and gravel driveway with header curb. Furnish and install a new chain link rock wall fence with double gate. The existing booster station, water storage tank, rock wall and piping will be demolished.

PLEASE SUPPLY QUOTE BY: 4/04/2017 @ 5:00 PM

RMCI, INC. is an equal opportunity employer and encourages a response from 8A, Small Business, Small Disadvantage Business, Women-Owned, HUBZONE, Minority, Veteran, or Service Disabled participant

For questions regarding this project contact Jordan Bateson at (505) 345-0008 or jbateson@rmciinc.com  


Details

Date:
April 5
Time:
10:00 am
Event Category: