Agency and Area-Wide Flood Control Maintenance Contract 2015-2016 – Albuquerque, NM

The  project consists of approximately 4227 linear feet of concrete overlay of the North Diversion Channel bottom beginning at Tucker Ave NE and proceeding north to the existing concrete overlay north of Indian School Rd NE, repairs of the North Diversion Channel floor at multiple locations and a side slope repair at the North Diversion Channel confluence with the South Pino Channel, replacement of a water quality screen at the North Pino Channel water quality structure, repairs in the Bear Canyon Arroyo east of Eubank Blvd NE, and the full depth repair of several sections of channel floor and/or channel slope in the I-40 (Embudo) Channel.

Owner: AMAFCA
Contract Amount: $1.1 Million

Project ManagerRobert Toledo