SWRP Power Loop A & B Design
The work consists of the construction of new FIS-B Electrical Building housing a new 15 kV, arc-resistant lineup. The 12.47
The work consists of the construction of new FIS-B Electrical Building housing a new 15 kV, arc-resistant lineup. The 12.47
The Work consisted of the demolition of select components of the existing Lift Station No. 20 Facility as well as
Providing a new guide system for the telescopic movement of the steel cover, new CPP coatings for the concrete, and
For this project we worked on the electrical and control system upgrades, rewinding of the existing 700HP – 4160V motors,
This project was for the completion of the Corrales Trunk Collector Pipeline Phase 3. We worked on improvements at Corrales