Tsankawi Chlorination Bldg. and WP Main Replacement NM4 and E. Jemez Rd
Wastewater treatment facilities require a range of equipment to operate effectively and efficiently, and sometimes that means upgrading or installing
Wastewater treatment facilities require a range of equipment to operate effectively and efficiently, and sometimes that means upgrading or installing
Water supply is a critical aspect of any community, and maintaining reliable and safe access to clean water is essential.
The work includes the construction of a new 1356-SF CMU Building to house a new 700-hp well pump, 12-inch interior
The Work consisted of 29,781 LF of 8” Sanitary Sewer Cleaning and CCTV, 20,931 LF of 8” Pipe Bursting, 3,446
The work includes procurement and installation of two (2) pre‐selected fine‐screens, procurement and installation of a pre‐fabricated HDPE membrane dip
The work consists of the construction of new FIS-B Electrical Building housing a new 15 kV, arc-resistant lineup. The 12.47
The Work consisted of the demolition of select components of the existing Lift Station No. 20 Facility as well as
Providing a new guide system for the telescopic movement of the steel cover, new CPP coatings for the concrete, and
Construction of a 1,800-GPM line-shaft vertical turbine well pump and motor set to 550 feet deep; a 3,500 square foot
This project consisted of a 3 MW Solar Array Installation. The racking system installed was the ATI System. A total