Laguna Wastewater Collection Improvements
The Work consisted of 29,781 LF of 8” Sanitary Sewer Cleaning and CCTV, 20,931 LF of 8” Pipe Bursting, 3,446
The Work consisted of 29,781 LF of 8” Sanitary Sewer Cleaning and CCTV, 20,931 LF of 8” Pipe Bursting, 3,446
The Work consisted of the demolition of select components of the existing Lift Station No. 20 Facility as well as
Providing a new guide system for the telescopic movement of the steel cover, new CPP coatings for the concrete, and
In wastewater treatment facilities, dewatering is a critical process to remove excess water from sludge, reducing its volume and making
This project consisted of a new prepackaged wastewater treatment plant for the Jemez Public Schools with the capacity to treat
This project consisted of the demolition of the existing blowers, aeration basin sluice gates, and the construction of an Equalization
For this project we worked on the electrical and control system upgrades, rewinding of the existing 700HP – 4160V motors,
This project was for the completion of the Corrales Trunk Collector Pipeline Phase 3. We worked on improvements at Corrales
The project consists of a 42’-8” by 22’-8” CMU Filter Building with floor trench drain, inlet and outlet water piping,