North Well Filtration Building
Client: Alamo Navajo School

The project consists of a 42’-8” by 22’-8” CMU Filter Building with floor trench drain, inlet and outlet water piping, drain line, lighting, heating, and wooden-truss roof sheathed with metal R-panels to house an owner-provided Water Filtration System installed by the Contractor. The Filtration System consists of three media filters, nanofiltration, reuse storage tanks, control panel, chlorination, and dichlorination processes. The project includes a booster pump skid, interior piping, an eyewash/shower station, a sink, and electrical controls. Construction of this water treatment facility started in March 2021 and was completed on September 2021.