The work includes the construction of a new 1356-SF CMU Building to house a new 700-hp well pump, 12-inch interior DI pipe and steel pipe, 70-lineal feet of 8-inch PVC yard pipe, and 165-lineal feet of 12-inch PVC yard pipe, check valves, pump control valves, flow meter, and pump mainline isolation valve. Electrical and control elements to include a new 480V VFD, Electrical Switchgear/Panels/Transformers/Manual Transfer Switch, Electric Metering, Lighting (interior/exterior), Fire Alarm System, Lightning Protection System, SCADA/RTU control panels/programming/wiring, and a new 1200A electric service. HVAC work includes louvers and dampers, an electric heater, and an exhaust fan.
The work also includes demoing and installing a new MCC with Soft Start at Otowi Well 4