fbpx
Well No. 3 Replacement – Phase 2
Client: Village Of Los Lunas

The project consisted of a new well No. 3 and booster pump buildings to house the replacement well No. 3. Triplex booster pumping station, FECL3 storage and feed equipment, MIOX on-site generation, storage and feed equipment, CO2 storage and feed equipment, HVAC and pumping, electrical and controls. Filtration building modifications include removal and replacement of the arsenic filter, process piping changes, electrical and controls modification, and HVAC upgrades. demolition of the existing well No. 3 building and flow meter vault, abandoned concrete vault storage shed south of the filter building, altitude vault modifications, and HC1 storage building. rehabilitation of a 500,000-gallon welded steel water storage tank with new overflow/drain piping. civil site work, yard piping, and site electrical.

Similar Projects We Have Built

RMCI Inc

RMCI Inc

Office Hours 7am-4pm MST

We are closed currently

Contact Us

Contact Form
RMCI Inc
Hey there 👋
You can give us a call or send us a message by clicking an option below 👇
Contact Us Now
chat